Combine production deployment and verified Arbeitnow activation #39
Loading…
Add table
Add a link
Reference in a new issue
No description provided.
Delete branch "agent/release-policy-activation-ab356766"
Deleting a branch is permanent. Although the deleted branch may continue to exist for a short time before it actually gets removed, it CANNOT be undone in most cases. Continue?
Production releases required a separate manual policy activation, making the new Arbeitnow policy easy to miss.
Add
bun run release:production --stage production --env-file deployment/cli-env.txt: stock Alchemy approval/deploy, fresh known-account routing verification before app authentication, then one fixedvalid-record-prefix-3activation through the release-matched CLI. Preserve separate build/manual recovery, frozen history and explicit partial-success reporting, with no resend, redeploy or rollback.Checks passed: frozen install, tooling, typecheck/build, deployment and stock-CLI qualification, 857 units, full native integration/history, all five offline demos, Nix build/check and diffcheck. Independent retained review cleared all findings, including original-failure retention, actual tsconfig build provenance and documentation links.
Parent PR38 is verified merged. No UI changes or real deployment, Cloudflare lookup, policy activation, collection or assessment-provider calls occurred; production execution remains separately approved.
Model: gpt-6.1-sol · Harness: Pi
72d696ef94to356e83c992